Solutions Bottleneck Detection

Bottleneck Detection

Integration Advisory Sprint

A two-week advisory engagement to design event-log extraction patterns from your existing system landscape.

Format
Advisory engagement
Duration
2-week sprint, fixed scope
Pricing tier
Lite
Monthly price
₩2,400,000

Description

The Advisory Sprint pairs a data integration engineer with your platform owners for two weeks to design event-log extraction patterns from SAP, Oracle, mainframe, or custom systems. The output is a buildable extraction design, an estimate of effort, and a list of risks and constraints. We do not deliver the integration itself in this engagement; that is a separate piece of work, often delivered by your own team using the design we produce.

What is included

  • Discovery of in-scope source systems and access patterns
  • Extraction design (push vs pull, batch vs streaming, identifiers, ordering)
  • Effort estimate with low / likely / high bands
  • Risk register with owner and mitigation suggestion
  • Hand-off pack ready for your engineering or systems integrator

What you can expect from this engagement

  1. 01 A buildable design your engineering team or integrator can pick up
  2. 02 An honest effort estimate covering the realistic range, not just the optimistic case
  3. 03 A risk register that supports the go / no-go decision before build commitment

Three questions buyers actually ask

Will you build the integration for us?

Not in this engagement. We deliver the design and the estimate. The build is a separate commitment, scoped after the design is reviewed.

What sources do you cover?

SAP, Oracle, ServiceNow, common mainframe environments, and well-documented custom systems. Undocumented bespoke systems require an extra day of discovery.

What does "likely" mean in the effort estimate?

It is the band where about half of comparable engagements have landed. We show the low and high bands explicitly so you can plan against the realistic upper bound, not the optimistic case.

What clients have said

  • The estimate bands were the most useful artefact. Other vendors gave us a single number that turned out to be the optimistic case.

    Engineering manager

  • Two weeks felt tight but the scope held. The hand-off pack went straight into our backlog.

    Hyun-woo Jeon , Platform Owner · 4.6/5